A visit to the Baixada Santista Light Rail System (VLT)
IEME and LAEDE played a key role in the execution of this engineering project, carried out by the construction company Álya. IEME was responsible for preparing all the track designs, including a complete study of the vibration attenuation system (mass-spring). LAEDE, in turn, was responsible for conducting the field and laboratory tests required for the permanent way’s approval.
Related Posts

IEME BRASIL Present at EVACES 2025 IEME BRASIL attended the 11th International Conference on Experimental Vibration Analysis for Civil Engineering Structures, EVACES... 
A visit to the Baixada Santista Light Rail System (VLT) IEME prepared all the track designs, including a complete study of the vibration attenuation... 
IEME Provides Accredited Inspection for Northern Rodoanel Rodoanel Construction IEME Brasil is honored to provide accredited inspection services for the construction work on the northern section of the Rodoanel Mário Covas... 
IEME Brasil in Revista Ferroviária IEME Brasil and LAEDE appear as one of the five consulting companies highlighted in an article in Revista...
