Archives: Crypto Portfolio

Next to SEHAB

IEME Brasil started a new contract with the São Paulo Municipal Housing Secretariat (SEHAB) to provide specialized services in the area of urban development. It is worth remembering that the previous work with SEHAB extended from 2012 to 2019 and benefited 82,056 families.

In that project, IEME was a pioneer in carrying out the registration of families using the municipal system Habisp and HabitaSampa. The work was carried out in all regions of the city of São Paulo and with different types of housing (slums, irregular subdivisions, housing complexes, tenements, etc.). In the final line of the process, after thousands of individual analyses, there was the delivery of property titles to eligible families that irregularly inhabited the mapped places.

The work involved architects, in the survey of each house (state, area, finishes, etc.), social workers, who collected documents and registered the families (number of residents in each unit, income, children and school attendance), and lawyers, who carried out the screening and analysis to categorize the situations encountered. With this information in hand, the city hall assigned property titles to those who were able to do so.

Before land regularization, families were afraid that someone would invade the house, because they did not have a property title. “Once they receive the title, everything changes. Life becomes more peaceful and they even invest in the conservation of the property. It is very exciting to see that, in some way, we are contributing to improving people’s quality of life”, says Liana Becocci, director of IEME Brasil.

Contract with CPTM provides for renovation of 11 CPTM stations

Accessibility for people with special needs (public and employees), as well as meeting the basic needs of comfort and safety of employees (in compliance with the NR-24 standard), is one of the focuses of an important contract between IEME Brasil and CPTM (Companhia Paulista de Trens Metropolitanos) for the refurbishment of 11 of the company’s stations.

Initiated in April 2018, the contract for specialized engineering and architecture technical services aims at the elaboration of the executive project for the adaptation of the stations and complete renovations, which include electrical, hydraulic and systems installations, intended to comply with the Fire Department Inspection Report (AVCB).

The work covers the following stations: Mooca, Ipiranga, São Caetano, Utinga, Prefeito Saladino, Santo André, Capuava, Mauá, Guapituba, Ribeirão Pires and Rio Grande da Serra.

So far, the complete executive projects for the renovation and adaptation of Capuava, Prefeito Saladino, São Caetano and Utinga stations have been completed, which have already been tendered and built. Tenders for the construction of the Santo André and Mauá stations are in progress. The executive projects for the other stations had different stages of development, but were interrupted by the client’s decision.

01_700x500
02_700x500
 
 
  • 01_700x500
  • 02_700x500

Suzano Municipal Drainage and Rainwater Management Plan (PMDMAP)

Suzano Municipal Drainage and Rainwater Management Plan (PMDMAP)

Coordinated and completed in 2022 by the Municipality of Suzano (SP), the Municipal Plan for Drainage and Management of Rainwater of Suzano (PMDMAP) carries out an extensive mapping of the municipality, identifying everything from roads, properties and occupations to the type of ground cover, basins and areas at risk for human occupation.

The study covers 45 areas (divided into several sectors) and is an important municipal management tool in several aspects, such as: urban occupation, transport and road development, social programs and environmental education.

In addition, the PMDMAP identifies regions subject to flooding, flooding and landslides, helping the city hall to intervene in critical areas and thus prevent accidents.

Consisting of a diagnosis by sector, the plan provides specific recommendations for solving problems for each one of them.

These may include garbage and debris cleaning services, improvements to the surface drainage system (rainwater, wastewater and/or sewage); earthworks to adjust or reduce the slope, drainage works and surface protection; implementation of containment structures (gravity walls, curtains, etc.), earthmoving services; implementation of surface vegetation protection (grasses) on slopes with exposed soil; cleaning and desilting of the drainage channel and even definitive removal of houses in the sector.

The PMDMAP, started in 2017, was funded by FEHIDRO (State Water Resources Fund), through the CBH-AT (Alto Tietê Basin Committee), and carried out by the companies Ieme Brasil and Base for the Suzano City Hall.

Cidade Legal – Lot IV

IEME provided technical support to 79 municipalities, totaling 630 housing centers served. Leading role in complying with the new land regularization legislation (Law 13,465/17). Preparation of reports aimed at guaranteeing the physical, urban and environmental security of the housing units served. Work with environmental agencies at the municipal and state levels. Humanized actions in the work with residents, ensuring diversification of days, times and places to serve the population. Adaptation of work dynamics, following the guidelines of health bodies during the Coronavirus pandemic. There were 114,720 families assisted.

Object of services

Specialized technical services, intended for the execution of the State Program for the Regularization of Housing Centers “Cidade Legal” (Legal City), Lot IV, instituted through State Decree nº 52.052/07, amended by State Decree nº 56.909/11, which provides for the signing of cooperation agreements between the State Government, through the State Housing Secretariat, and the interested municipalities, with the purpose of providing advice and technical support for the land tenure regularization of housing units located in urban areas or areas undergoing urban expansion.

Main activities

Preliminary analysis;

Analysis and Diagnosis;

Regularization Plan;

Topographic Survey;

Environmental Technical Study;

Inspections; Social Register;

Urban Regularization Project;

Descriptive Memorandums for real estate registration;

Land Study;

Environmental Approval;

Report for geological risk assessment;

Registration of the nucleus with the Real Estate Registry Office;

cidade_legal_foto2_700x500
cidade_legal_foto3_700x500
cidade_legal_foto4_700x500
 
 
  • cidade_legal_foto2_700x500
  • cidade_legal_foto3_700x500
  • cidade_legal_foto4_700x500

Mapping of the neighboring community around the works on Line 6 – Orange of the São Paulo Metro

IEME worked along the stretch of 13 construction units for the works on Line 6 – Orange of the São Paulo subway. Assembly of a specific database, aiming to meet the needs of the Contracting Party. Work with the occupants of the surroundings of the works on Line 6 – Orange of the São Paulo subway of different socioeconomic ranges. Development of methodology for performance in buildings and buildings. Constant communication to reduce resistance to the research application process. There were 2,644 residential and non-residential surveys applied.

Object of services

Provision of mapping services for the neighboring community around the works on Line 6 – Orange of the São Paulo Metro.

Main activities

Definition of the radius of influence of work activities.

Real estate sealing.

Elaboration of sealing plants.

Application of individual research in the properties of the area of influence.

Critical research analysis.

Database creation.

Elaboration of consolidated reports of special cases.

linha_uni_foto1_700x500
linha_uni_foto2_700x500
linha_uni_foto3_700x500
linha_uni_foto4_700x500
linha_uni_foto5_700x500
 
 
  • linha_uni_foto1_700x500
  • linha_uni_foto2_700x500
  • linha_uni_foto3_700x500
  • linha_uni_foto4_700x500
  • linha_uni_foto5_700x500

SEHAB – Registration

IEME is a pioneer in carrying out the registration of families using the Habisp and HabitaSampa municipal system. Performance in all regions of the city of São Paulo and in different types of housing (slums, irregular subdivisions, housing complexes, tenements, etc.). Acting in all housing programs in the city of São Paulo. Acting in partnership with the Housing Department in crisis situations, such as eviction orders, removals, risks, etc. Registration of properties and residents of the region called “Cracolândia” in the central region of São Paulo. There were 82,056 families assisted.

Object of services

Specialized professional technical services of consultancy, advisory, management, monitoring and execution of surveys and registrations foreseen in the programs and housing developments under the responsibility of the Municipal Housing Secretariat – SEHAB, of the Municipality of São Paulo – Housing Coordination, integrated by the Superintendence of Low-income Housing – HABI and by the Land Installment Regularization Department – RESOLO, with the support of goods and other related services for its execution.

Main activities

Communication pieces;

Production controls;

Sectorization in the field;

Sealing of real estate;

Sealing maps;

Registration application in mobile system;

Critique and checking of registrations;

Data tabulation;

Cores shapefile.

sehab_parque_foto1_700x500
sehab_parque_foto2_700x500
sehab_parque_foto3_700x500
sehab_corrego_foto1_700x500
sehab_corrego_foto2_700x500
sehab_corrego_foto3_700x500
sehab_corrego_foto4_700x500
sehab_corrego_foto5_700x500
 
 
  • sehab_parque_foto1_700x500
  • sehab_parque_foto2_700x500
  • sehab_parque_foto3_700x500
  • sehab_corrego_foto1_700x500
  • sehab_corrego_foto2_700x500
  • sehab_corrego_foto3_700x500
  • sehab_corrego_foto4_700x500
  • sehab_corrego_foto5_700x500

Cidade Universitária and Tatuapé bridges

Inspection of works of art in SP

At the request of the Public Prosecutor’s Office, IEME Brasil inspected the Tatuapé bridge, in the East Zone of São Paulo, and found large displacements of some support devices, exposed armor, breakage of prestressing cables and other faults. The need for interdiction, however, was discarded. The company also inspected the Cidade Universitária bridge, in the West Zone, and found that it does not need to be closed despite showing damage, such as broken pretension cables.

Read an article by Folha de S. Paulo on the subject here.

Photo: Folha de S. Paulo

2.FolhaSP_Mar_19

Guarantee of operation of equipment at Hospital São Paulo

São Paulo Metro overcomes another challenge

An article in “Revista Brasil Engenharia – Especial Metrô 50 anos”, by Adilson Roberto Takeuti and Antônio José Caldas de Souza, deals with the development of a superstructure system that absorbs vibrations and secondary noise to guarantee the perfect functioning of the magnetic resonance equipment of the Hospital São Paulo, in the South Zone of São Paulo. IEME Brazil participated in the project.

Read the full article here.

Support for the implementation of housing policies in the municipality of Suzano

IEME develops research and qualitative reports on the areas where it operates. Development and application of activities monitoring and evaluation actions. Elaboration and implementation of a georeferenced database. Development of programs for the socioeconomic insertion of vulnerable families. Development of socio-environmental studies. Support in the implementation of condominiums and other condominium actions in new housing developments. There were 21,233 families assisted.

Object of services

Support for the implementation of the municipality’s housing policies, with regard to areas occupied by precarious settlements and/or subdivisions that will be affected by the respective program, as well as the support of goods and services for their fulfillment, with the provision of teams for the work fronts indicated by the Municipal Department of Urban Policy.

Main activities

Qualitative Research (Socio-organizational Study);

Quantitative Research (Socioeconomic Study);

Analytical systematic reports;

Elaboration of evaluation and monitoring indicators;

Georeferenced Topographic Survey;

Thematic Maps;

Qualitative urban-environmental surveys;

Creation, structuring, implementation and management of a georeferenced database (Geographic Information Systems – GIS);

Social Diagnosis;

Social duty;

Valuation of real estate;

Removal of families;

Preparing residents for the post-urbanization stage;

Post-Occupancy Social Work in Housing Complexes;

Condominium Management with group training;

Management of Areas and Collective Facilities;

Elaboration of Social Technical Work Project, including Mobilization, Participation and Community and Citizen Organization;

Sanitary and Environmental Education;

Job and Income Generation and Professional Qualification Project;

Social Environmental Work Plan;

Delivery of Concession Titles for Housing Purposes;

Inspections to verify the accessibility situation of commercial establishments in the center of the municipality of Suzano;

Elaboration of the dossiers of the beneficiary families of the Minha Casa Minha Vida Program;

Support in actions resulting from the construction of housing developments of social interest;

Support in negotiations for repossession of invaded housing developments;

Support in the preparation and supervision of projects and management of urban and housing infrastructure works;

Support for the identification and removal of families residing in irregular occupations and in risk areas;

Support for carrying out the demolition of properties placed in irregularly occupied areas;

Support for the creation of a map identifying new areas for inclusion in the Social Interest Zoning Law – ZEIS;

Execution of technical inspection and monitoring of works at CEU – Unified Educational Center – Suzano;

Support in actions linked to the Environmental Revitalization and Compensation Project, with the execution of a study on the native flora of the Atlantic Forest;

Elaboration of proposal for implementation of the Composting Process of the municipality;

Support for holding meetings with the community to discuss the review of the Suzano Participatory Master Plan (2014/2024).

suzano2_foto1_700x500
suzano2_foto3_700x500
suzano2_foto4_700x500
suzano2_foto5_700x500
 
 
  • suzano2_foto1_700x500
  • suzano2_foto3_700x500
  • suzano2_foto4_700x500
  • suzano2_foto5_700x500

IEME at the Olympics

Inspection of the Deodoro Sports Complex

The Deodoro Sports Complex, located in Vila Militar in Rio de Janeiro, hosted 11 Olympic sports and four Paralympic sports during the 2016 Games.

The structures of the bleachers are frequently subjected to dynamic requests caused by the movement of the public during games, presentations or shows. In these events, the request is usually imposed in a “rhythmic” way and, as a consequence, the structure is subjected to cyclic displacements at certain frequencies, resulting in vibrations. Depending on the intensity, this phenomenon can cause discomfort to users and, in an extreme situation, public panic and structural impairment.

For these reasons, tests were carried out to characterize the dynamic behavior of the provisional stands at the Complexo de Deodoro.

DERSA – Northern Section Rodoanel

IEME prepared appraisal reports for properties and tree species. Development of plans in accordance with the Inter-American Development Bank (IDB), the financier of the work. Development and implementation of a social support program for evicted families, businesses and communities surrounding the works. Development of methodology for the distribution of housing units. Monitoring of properties in the vicinity of the works to assess claims and damages. Support for families and traders in relocating to new properties outside the removal perimeter. Support for families resettled in housing complexes. There were 1,111 families assisted.]

Object of services

Technical consulting services specialized to support the Coordination of Social Actions and Removal of Families, in the implementation of the Rodoanel Mário Covas project – North section, comprising Lot 2.

Main activities

Work plan;

Socio Territorial and Land Recognition;

Population Mobilization; Assemblies with the Population;

Sealing of real estate;

Socioeconomic Research;

Database;

Evaluation of Improvements,

Elaboration of Social Reports of Equivalence to Housing and Tree Cultures and Specimens;

Identification and Monitoring of Risk Situations;

Elaboration of Social Diagnosis;

Resettlement and Compensation Plan;

Monitoring Program for the Risk of Impoverishment of Families, Merchants and Service Providers;

Social duty;

Social Accompaniment to Families in the acquisition of real estate;

Carrying out removals;

Claims and Breakdowns;

Social Support and Community Development Program.

dersa_rodoanel_norte_foto1_700x500
dersa_rodoanel_norte_foto3_700x500
dersa_rodoanel_norte_foto4_700x500
dersa_rodoanel_norte_foto5_700x500
 
 
  • dersa_rodoanel_norte_foto1_700x500
  • dersa_rodoanel_norte_foto3_700x500
  • dersa_rodoanel_norte_foto4_700x500
  • dersa_rodoanel_norte_foto5_700x500

Cidade Legal – Lot V

IEME provided technical support to 81 municipalities, totaling 754 housing centers served. Multidisciplinary action, integrating the urban, environmental, social and legal areas. Development of training and qualification activities for municipal technicians. Joint action with the state government of São Paulo to guarantee legal security for residents of the housing units served. There were 50,772 families assisted.

Object of services

Specialized technical services, destined to the execution of the State Program of Regularization of Housing Nuclei “Cidade Legal” (Legal City), instituted through the State Decree nº 52.052/07, that has as objective to assist the municipalities through guidance and technical support to the municipal actions of regularization of installments of the land and housing units, public or private, for residential purposes, located in urban areas or urban expansion.

Main activities

Document search / Preliminary report;

Analysis and Diagnosis; Regularization Plan;

Topographic survey;

Urban regularization project;

Environmental technical study;

Descriptive memorials for real estate registration;

Training of municipal technicians;

Title opening; Urban demarcation;

Overlay plans and land studies;

Draft bills;

Prior environmental opinion for framing the nucleus as a Social Interest Recovery Program (PRIS);

Preparation of PRIS;

Registration of the nucleus with the Real Estate Registry Office.

cidade_legal_foto1_700x500
 
 
  • cidade_legal_foto1_700x500

2014 World Cup

Arena Corinthians under inspection

The safety of Arena Corinthians, the opening stage of the 2014 World Cup, was evaluated by our team through a forced vibration test. For this, Vibrodina was used, mechanical generator equipment that simulates the movement of fans on the stands. In this way, it was possible to evaluate the dynamic behavior and find out if the structure was adequate in terms of safety and comfort parameters so that everything went well at the beginning of the Cup.

 

See below the article by Máquina do Esporte – 02/05/2013.

IEME Brasil evaluates the security of Arena Corinthians

7.-MaqEsporte_Mai_13

DERSA – Marginal Tietê

IEME accompanied the beneficiary families from the local diagnosis to the definitive relocation. Daily presence of the social and urban team in the field to serve the target population of the project. Development of actions to support residents, assisting in the collection of documents, procedures for moving, relocation to health and educational services, etc. Interface of the urban and social team with the engineering teams responsible for the removal and demolition of properties. There were 5,698 families assisted.

Object of services

Specialized Social Management services for the removal and resettlement processes of families affected by the Marginal Tietê revitalization works.

Main activities

Mapping of nuclei and characterization of populations;

Secondary data collection;

Population Mobilization;

Property Registry – Sealing;

Socioeconomic study – Social Registry;

Social duty;

Database;

Execution of the Service Plan;

Carrying out the removal of families;

Social support for families in the transition phase; Distribution of housing units;

Moving to permanent housing units.

dersa_foto1_700x500
dersa_foto2_700x500
dersa_foto3_700x500
 
 
  • dersa_foto1_700x500
  • dersa_foto2_700x500
  • dersa_foto3_700x500

DERSA – Southern Section Rodoanel

IEME supported the contracting party in drawing up the service policy. Permanent contact with the population, providing greater speed to the vacancy process. Multidisciplinary actions to welcome the population in new housing locations, ensuring the quality of housing units and reintegration into local public facilities. There were 1,629 families assisted.

Object of services

Specialized technical services for social management for the removal and resettlement of families affected by the Rodoanel Mário Covas – Southern Section.

Main activities

Mobilization of the population;

Meetings with the population;

Sealing of real estate; Social register;

Individual measurement of registered properties;

Evaluation reports of improvements in irregular areas;

Data tabulation;

Social duty;

Definition of proposals for serving the population;

Removals of families to clear the work front;

Social support for families in transition;

Inspection follow-up (check list) of permanent housing units;

Social monitoring of families in the post-occupation period.

dersa_rodoanel_sul_foto1_700x500
dersa_rodoanel_sul_foto2_700x500
dersa_rodoanel_sul_foto3_700x500
 
 
  • dersa_rodoanel_sul_foto1_700x500
  • dersa_rodoanel_sul_foto2_700x500
  • dersa_rodoanel_sul_foto3_700x500

HABI – Urbanistic and Land Regularization

IEME carried out an innovative action in the post-titling follow-up of regularized housing nuclei, including feedback to residents and various guidelines. Legal assistance to the target population of land regularization actions. Social follow-up at all stages of land regularization procedures.

Object of services

Specialized technical services for the implementation of the 2nd Phase of the Urbanistic and Land Regularization Program of the Popular Housing Superintendence of the Municipal Housing Secretariat, referring to field work in the intervention areas, as well as the support of goods and services necessary for the execution.

Main activities

Social follow-up (recognition of the areas and communities and dissemination of the Program, Social Duty, Post-titling sectoral meetings);

Social registration (Sectorization, Sealing of Properties, Application of Social Registration);

Production of cartographic bases (physical-environmental diagnosis and elaboration of the Mass Plan, Consolidation of subdivisions and digitized geocoding);

Legal advice;

Multiprofessional support in the delivery of titles;

Cadastral Aerophotogrammetric Survey.

habi_foto1_700x500
habi_foto2_700x500
habi_foto3_700x500
habi_foto4_700x500
habi_foto5_700x500
 
 
  • habi_foto1_700x500
  • habi_foto2_700x500
  • habi_foto3_700x500
  • habi_foto4_700x500
  • habi_foto5_700x500